WWTF SCADA SYSTEM
The radio part of project was handover by Georgian Water and Power Company to ours. The customer was Sanzona Plant and the project was the improvement and development plan of the SCADA system including:
Final Design and installation of a wireless radio SCADA communication system for remote sites
Included MDS radios, control system upgrades, ControlLogix PLCs, and PanelView Upgrades
Upgrade from leased-line telemetry at 36 sites to new radio-based telemetry system using SCADA WAN microwave link at six head-end sites
PLC system design based on Allen-Bradley CompactLogix platforms utilizing Ethernet communication